HACI ALİ DOĞAN MEN STUDENT DORMITORY

Total construction area: 4.800 m²
Construction started on 04.02.2013. 2013-2014 school year.
Conference hall, refectory, library, gym.
A total capacity of 300 students. The ground floor has 4 floors and a total of 5 floors.